Saturday 12 July 2014

Construction Update - Week 18 - Painting and Tiling

I was not able to get out to the site last weekend (week 17), so it has been two weeks since my last post.  Lots of changes have been going on in the last two weeks.  These include:
  • Some of the exterior window architraves have been installed
  • Tiling of the bathrooms, powder rooms and laundry
  • The splashbacks have been installed in the kitchen
  • Painting!!
I have to say, walking through the house today, with painted walls and seeing the tiling was pretty exciting.  Here are the pics!

From the Front
From the Front
From the Rear
Panoramic shot of kitchen, with Dining Area to left and Lounge are to the right
Panoramic shot, with Living Area to the left and kitchen to the right

Panoramic shot, with Rumpus Room to the left and kitchen/dining to the right
 
Panoramic shot of Rumpus Room, with hallway and stairs to the left and the Living Room to the right


Painting!! The view from the front door down the hallway

Panoramic shot - the master bedroom

Panoramic shot - the upstairs living area



Tiling in Laundry
Tiling in the Powder Room
 


Bathroom Shower



Bathroom Vanity and Bath
Toilet Tiling


Ensuite Shower Tiling


Ensuite vanity tiling