Another week and a bit more progress to report. This week the heating system has been installed and the painting has been finished. Also the ceiling batons for the Alfresco have been installed and the shelving in the linen cupboards and wardrobes has been installed.
Here are the usual pics
 |
From the Front |
 |
From the Front |
 |
From the Rear |
 |
From the Rear |
 |
Ceiling Batons for the Alfresco |
 |
Shelving in the Upstairs Linen Cupboard |
And here are the usual panorama shots. Not a lot has changed here, but if you look closely you will see the ceiling vents for the heating system
 |
Panoramic shot of kitchen, with Dining Area to left and Lounge are to the right |
 |
Panoramic shot, with Living Area to the left and kitchen to the right |
 |
Panoramic shot, with Rumpus Room to the left and kitchen/dining to the right |
 |
Panoramic shot of Rumpus Room, with hallway and stairs to the left and the Living Room to the right |
No comments:
Post a Comment